Our Work

Project 1

Flat to Pitch roof conversion. This job was carried out in Dunbartonshire for returning client. Flat roof made to a pitch with a timber kit then galvanised top hats were fitted to the timber kit to act as purlins for the single skin roof sheets.

Project 1

Flat to Pitch roof conversion. This job was carried out in Dunbartonshire for returning client. Flat roof made to a pitch with a timber kit then galvanised top hats were fitted to the timber kit to act as purlins for the single skin roof sheets.

Project 2

Cladding composite panel side walls for a client in Glasgow with the use of a crane and clad boy to position the panels safely in place.

Project 2

Cladding composite panel side walls for a client in Glasgow with the use of a crane and clad boy to position the panels safely in place.

Project 3

Full cladding package for a fire training facility in Aberdeen. Walls all done in a single skin 0.7mm gauge sheet and the roof was fitted with Dekra roof panels.

Project 3

Full cladding package for a fire training facility in Aberdeen. Walls all done in a single skin 0.7mm gauge sheet and the roof was fitted with Dekra roof panels.

Project 4

This job was carried out in Kirkcaldy and turned out a great transformation. Stripped back to the bare shell and introduced new timber purlins then 40mm composite panels to walls and sides.

Project 4

This job was carried out in Kirkcaldy and turned out a great transformation. Stripped back to the bare shell and introduced new timber purlins then 40mm composite panels to walls and sides.

Project 5

This project was for a new client in Hull England. 4290m2 of single skin roofing sheets, CGL membrane gutters and single skin side wall sheets.

Project 5

This project was for a new client in Hull England. 4290m2 of single skin roofing sheets, CGL membrane gutters and single skin side wall sheets.

Project 6

2500m2 of double skin asbestos strip and re sheeted in 120mm thick insulation composite panel. 160 meters of weather fast gutter liner system.

Project 6

2500m2 of double skin asbestos strip and re sheeted in 120mm thick insulation composite panel. 160 meters of weather fast gutter liner system.